Description
The Paprsky Battery-Operated Hydraulic Cable Cutter (PT-HCC-162) is a high-capacity, industrial-grade shearing machine built to sever large-diameter power conductors effortlessly. Delivering a massive 180 kN hydraulic force alongside a 360° swiveling flip-top cutting head, it is engineered to conquer demanding cutting tasks across heavy industrial environments. Integrated with intelligent micro-control circuitry, the PT-HCC-162 features automatic pressure relief and cycle reset to maximize operator safety and workflow productivity. Its rugged construction delivers clean, deformation-free shears on copper and aluminium cables up to Ø120 mm and steel-armoured cables up to Ø100 mm, establishing it as an indispensable solution for utility networks and infrastructure developments.
Technical Specifications
| Feature | Specification |
| Output Force | 180 kN |
| Stroke Length | 62 mm |
| Cutting Capacity |
Copper and aluminium cables: Up to Ø120 mm Armoured power cables: Up to Ø100 mm |
| Battery Rating | 20 V |
| Recharge Duration | Approximately 1.5 hours |
| Tool Weight | 13.3 kg |
| Dimensions (L × W × H) | 665 × 120 × 500 mm |
Key Features
- High-Tonnage Shearing Force: Channels an impressive 180 kN of hydraulic force to slice cleanly through high-capacity conductors and dense metallic armouring.
- Large-Diameter Capacity: Efficiently accommodates heavy mains conductors up to Ø120 mm across and armoured feeds up to Ø100 mm.
- 360° Rotating Flip-Top Jaw: Fully swiveling open-latch head allows effortless cable positioning, side-loading, and operation at any angle in cramped workspaces.
- Intelligent Micro-Control System: Automatically vents internal hydraulic pressure upon completion of the cut and returns the blade to its initial position.
- High-Performance Cordless Platform: High-capacity 20 V battery ensures continuous, portable cutting power on-site with a rapid 1.5-hour recharge cycle.
Applications
- Utility & Grid Infrastructure: Cutting large underground transmission lines, sub-surface feeder runs, and primary power cables.
- High-Voltage System Servicing: Sizing, replacing, and decommissioning heavy overhead and substation conductor lines.
- Industrial Facility Decommissioning: Swiftly and cleanly severing heavy plant cabling during equipment demolition and site upgrades.
- Renewable Energy Networks: Installing, routing, and sizing high-capacity collector cables in utility-scale solar PV and wind power plants.